Filters
Question type

Study Flashcards

Quality and highly capable production systems are requirements for the successful implementation of lean operations.

A) True
B) False

Correct Answer

verifed

verified

Although inventories are maintained, the goal of lean operations is to minimize safety stock.

A) True
B) False

Correct Answer

verifed

verified

When lean is used in the context of services, which of the following is most often the focus?


A) the labor content of the service
B) the time needed to perform a service
C) the inventory tied up in the service
D) the equipment used in the service
E) suppliers of inputs to the service

F) A) and E)
G) A) and D)

Correct Answer

verifed

verified

In the lean philosophy, the ideal lot size is:


A) the economic order quantity.
B) the economic run size.
C) one unit.
D) the capacity of the standard container.
E) N = (DT(1 + X) ) /C.

F) D) and E)
G) B) and D)

Correct Answer

verifed

verified

Setup time and its associated cost can often be reduced by the use of group technology.

A) True
B) False

Correct Answer

verifed

verified

A functioning MRP system is required prior to adopting lean planning and control systems.

A) True
B) False

Correct Answer

verifed

verified

A potential obstacle to conversion to a lean system is: (I) lack of management commitment (II) lack of worker cooperation (III) supplier resistance (IV) insufficient space to store the increased inventories


A) only I
B) only I and II
C) only II and III
D) only I, II, and III
E) only II, III, and IV

F) All of the above
G) B) and E)

Correct Answer

verifed

verified

The Five S's do not include:


A) Sort.
B) Straighten.
C) SanitizE.
D) Sweep.
E) Standardize.

F) B) and D)
G) A) and E)

Correct Answer

verifed

verified

In the lean approach, inventories are reduced gradually, instead of eliminating inventories as rapidly as possible.

A) True
B) False

Correct Answer

verifed

verified

The approaches used in lean systems to deal with quality include:


A) only I
B) only I and II
C) only III and IV
D) only I, II, III, and IV
E) I, II, III, IV, and V

F) A) and C)
G) All of the above

Correct Answer

verifed

verified

A production kanban card is used to signal that:


A) there is a need to produce parts at the work center.
B) parts are ready to be moved to the next station.
C) there is a need to deliver parts to the next work center.
D) a machine has broken down and needs immediate attention.
E) a machine is ready for preventive maintenance.

F) C) and E)
G) B) and C)

Correct Answer

verifed

verified

The ultimate goal of lean operations is to have:


A) no in-process inventories.
B) cross-trained workers capable of handling every process.
C) a smooth, rapid flow of work through the system.
D) no setup times.
E) all of the choices.

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

Although lean systems tend to produce standardized product lines, to provide production variety without accompanying waste, lean producers often use __________ in __________.


A) standardized parts; modular designs
B) jidoka parts; kaizen designs
C) modular parts; flexible designs
D) capable parts; automated designs
E) heijunka parts; kanban designs

F) A) and B)
G) C) and E)

Correct Answer

verifed

verified

Previously, management calculated the number of kanban cards allowed by using a value of 1.3 for X. Assuming nothing else (e.g., usage rates, container capacities, etc.) , which of the following values for X would indicate management's belief that the system has become more efficient?


A) 2.6
B) 2.3
C) 1.5
D) 1.4
E) 1.2

F) B) and D)
G) A) and D)

Correct Answer

verifed

verified

A basic requirement for operating with the low inventories present in lean systems is:


A) Inventory space must be increased.
B) Inventory investment must be increased.
C) Major problems must be identified.
D) Major problems must have been solveD.
E) Inventories must be reduced rapidly.

F) C) and D)
G) A) and B)

Correct Answer

verifed

verified

A successful conversion to a lean system requires that the conversion:


A) be done as quickly as possible.
B) begin at the start of the process and work forward.
C) convert vendors to lean as one of the last steps.
D) reduce setup times as one of the last steps.
E) all of the choices.

F) A) and B)
G) C) and D)

Correct Answer

verifed

verified

Which one of the following is not one of the building blocks that is the foundation of the lean philosophy?


A) product design
B) process design
C) personnel/organizational elements
D) manufacturing planning and control
E) Kanban

F) A) and C)
G) All of the above

Correct Answer

verifed

verified

A benefit of the lean philosophy is the flexibility to respond quickly to changing customer product preferences.

A) True
B) False

Correct Answer

verifed

verified

The use of small lot sizes in lean operations is in conflict with the EOQ approach since setup costs tend to be significantly higher than holding costs.

A) True
B) False

Correct Answer

verifed

verified

Showing 61 - 79 of 79

Related Exams

Show Answer