The key questions in the process selection task are: (i) How will the prodioct/service be priced? (ii) How much variety wall be imposed on the process? (1ii) What is the target market for the product/service? (IV) At what volume will the grocirss need to operate?


A)  I and III
B)  II and IV
C)  II and III
D)  I and IV
E)  III and IV

F) A) and E)
G) A) and D)

Correct Answer

verifed

verified

Computer-integrated manufacturing integrates all of the following except ______________ with manufacturing.


A)  consumer satisfaction surveys
B)  engineering design
C)  purchasing
D)  production planning and control
E)  order processing

F) None of the above
G) C) and D)

Correct Answer

verifed

verified

A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line six hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product: A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line six hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product:   For output to equal projected demand, what will be the idle time at the second workstation of the assembly line that uses the minimum number of workstations? A)  0 seconds B)  1 second C)  2 seconds D)  3 seconds E)  5 seconds For output to equal projected demand, what will be the idle time at the second workstation of the assembly line that uses the minimum number of workstations?


A)  0 seconds
B)  1 second
C)  2 seconds
D)  3 seconds
E)  5 seconds

F) C) and E)
G) C) and D)

Correct Answer

verifed

verified

B

A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line six hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product: A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line six hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product:   Without regard to projected demand, what is the minimum possible cycle time for this assembly line? A)  0 seconds B)  3 seconds C)  9 seconds D)  10 seconds E)  28 seconds Without regard to projected demand, what is the minimum possible cycle time for this assembly line?


A)  0 seconds
B)  3 seconds
C)  9 seconds
D)  10 seconds
E)  28 seconds

F) A) and D)
G) None of the above

Correct Answer

verifed

verified

The main issue in the design of process layouts concerns the relative positioning of the departments involved.

A) True
B) False

Correct Answer

verifed

verified

An example of automated services is:


A)  online banking.
B)  build your own pizza.
C)  haircuts.
D)  massage parlors.
E)  financial advising.

F) B) and C)
G) B) and D)

Correct Answer

verifed

verified

A

In general, job-shop systems have a lower unit cost than continuous systems do because continuous systems use costly specialized equipment.

A) True
B) False

Correct Answer

verifed

verified

In the use of closeness ratings for process layouts, the code U means the closeness between two departments is:


A)  (U) nknown.
B)  (U) nusually important.
C)  of (U) sual importance.
D)  (U) nimportant.
E)  (U) ndesirable.

F) B) and C)
G) A) and E)

Correct Answer

verifed

verified

QRS Corp. is designing a product layout for a new product. They plan to use this production line 10 hours a day in order to meet forecasted demand of 900 units per day. The following table describes the tasks necessary to produce this product: QRS Corp. is designing a product layout for a new product. They plan to use this production line 10 hours a day in order to meet forecasted demand of 900 units per day. The following table describes the tasks necessary to produce this product:   For output to equal forecasted demand, what should be the actual cycle time for this production? A)  32 seconds B)  38 seconds C)  40 seconds D)  76 seconds E)  152 seconds For output to equal forecasted demand, what should be the actual cycle time for this production?


A)  32 seconds
B)  38 seconds
C)  40 seconds
D)  76 seconds
E)  152 seconds

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

Laser technology used in surgical procedures is an example of technological advances in:


A)  product.
B)  facility layout.
C)  process.
D)  information.
E)  reverse engineering.

F) D) and E)
G) A) and C)

Correct Answer

verifed

verified

Product profiling links key product or service requirements to:


A)  market conditions.
B)  order sizes.
C)  pricing strategies.
D)  schedule changes.
E)  process capabilities.

F) All of the above
G) C) and D)

Correct Answer

verifed

verified

Process layouts feature departments or other functional groupings of personnel or equipment.

A) True
B) False

Correct Answer

verifed

verified

True

A disadvantage of a product layout can be high in-process inventory costs.

A) True
B) False

Correct Answer

verifed

verified

A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.50 per load meter moved. An analyst has prepared the following flow and distance matrices: A company needs to locate three departments (X, Y, and Z)  in the three areas (I, II, and III)  of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.50 per load meter moved. An analyst has prepared the following flow and distance matrices:   If the company were to locate departments X, Y, and Z in areas I, II, and III, respectively, what would be the total distance (in meters)  loads would be moved each week? A)  3,100 B)  3,600 C)  6,200 D)  6,700 E)  8,200 If the company were to locate departments X, Y, and Z in areas I, II, and III, respectively, what would be the total distance (in meters) loads would be moved each week?


A)  3,100
B)  3,600
C)  6,200
D)  6,700
E)  8,200

F) All of the above
G) C) and D)

Correct Answer

verifed

verified

Which of the following is not an approach that companies use to achieve a smooth flow of production?


A)  line balancing heuristics
B)  parallel workstations
C)  dynamic line balancing (cross-training workers)
D)  mixed model line
E)  Companies use all of these.

F) All of the above
G) B) and D)

Correct Answer

verifed

verified

Which of the following is not an information requirement for the design of a process layout?


A)  a list of departments or work centers
B)  a projection of work flows between the work centers
C)  the distance between locations
D)  the cost per unit of distance to move loads
E)  a list of product cycle times for every product manufactured

F) B) and E)
G) B) and D)

Correct Answer

verifed

verified

When new products or services are being planned, process selection occurs as a matter of course. Process selection also comes into play as a result of: (I) technological changes. (II) competitive pressures. (III) fundamental changes in demand patterns.


A)  I only
B)  II only
C)  III only
D)  I and II but not III
E)  I, II, and III

F) A) and D)
G) A) and C)

Correct Answer

verifed

verified

The grouping of equipment by the operations needed to perform similar work for part families is:


A)  product layout.
B)  cellular manufacturing layout.
C)  functional layout.
D)  fixed-position layout.
E)  process layout.

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet projected demand of 480 units per day. The tasks necessary to produce this product are: A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet projected demand of 480 units per day. The tasks necessary to produce this product are:   Without regard to demand, what is the minimum possible cycle time (in seconds)  for this situation? A)  162 B)  72 C)  54 D)  30 E)  6 Without regard to demand, what is the minimum possible cycle time (in seconds) for this situation?


A)  162
B)  72
C)  54
D)  30
E)  6

F) A) and C)
G) C) and D)

Correct Answer

verifed

verified

An advantage of a U-shaped production line is that it facilitates teamwork and flexibility in work assignments.

A) True
B) False

Correct Answer

verifed

verified